Schedules Menu
Create DB Schedule...
To generate a Distribution Board schedule showing circuits and electrical loads.
How to Use:
- Navigate to Schedules > Create DB Schedule...
- Select the Distribution Board you want to create a schedule for from the list.
- Enter a unique name for the schedule (a default name is suggested).
- The schedule window opens showing all circuits connected to the DB.
What the Schedule Shows:
- DB Information - Supply source, phase configuration, and breaker sizing
- Cable Information - Cable types and sizes for the main supply
- Load Information - Total power, diversified power, and current per phase
- Circuit Details - All connected circuits with their loads and breaker assignments
Schedule Features:
- Balance Loads - Automatically distribute circuits across phases for optimal balance
- Manage Cable Types - Add or edit available cable specifications
- Manage Breaker Sizes - Customize the list of available breaker ratings
- Manage Breaker Types - Define breaker characteristics (MCB, MCCB, etc.)
- Manage Outlet Types - Configure outlet diversity factors
Tips:
- You must have at least one Distribution Board in your project before creating a DB schedule.
- Double-click on any circuit row to navigate to that element on the canvas.
- Right-click on items for additional options like editing properties.
- The schedule automatically updates when you modify circuits or loads.